Cargando…
Injector for CESAR (2 MeV electron storage ring): 2-beam, 2 MV van de Graaff generator; tank removed.
The van de Graaff generator in its tank. For voltage-holding, the tank was filled with pressurized extra-dry nitrogen. 2 beams emanated from 2 separate electron-guns. The left beam, for injection into the CESAR ring, was pulsed at 50 Hz, with currents of up to 1 A for 400 ns. The right beam was sent...
Autor principal: | |
---|---|
Lenguaje: | ENG |
Publicado: |
1968
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41118 |
Sumario: | The van de Graaff generator in its tank. For voltage-holding, the tank was filled with pressurized extra-dry nitrogen. 2 beams emanated from 2 separate electron-guns. The left beam, for injection into the CESAR ring, was pulsed at 50 Hz, with currents of up to 1 A for 400 ns. The right beam was sent to a spectrometer line. Its pulselength was also 400 ns, but the pulse current was 12 microA, at a rate variable from 50 kHz to 1 MHz. This allowed stabilization of the top-terminal voltage to an unprecedented stability of +- 100 V, i.e. 6E-5. Although built for a nominal voltage of 2 MV, the operational voltage was limited to 1.75 MV in order to minimize voltage break-down events. CESAR was terminated at the end of 1967 and dismantled in 1968. R.Nettleton (left) and H.Burridge (right) are preparing the van de Graaff for shipment to the University of Swansea. |
---|