Cargando…
Construction of gantries for the EB line at Gauder in Belgium.
Spooling and despooling gantries are constructed by Gauder in Belgium, as subcontractor of TECHMETA. These gantries are destined to the EB line at TECHMETA.
Autor principal: | Folch, R |
---|---|
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41158 |
Ejemplares similares
-
PL. Riboni and D. Campi at Gauder in Belgium.
por: Folch, F
Publicado: (2000) -
Construction of building extension at TECHMETA to accept EB line.
por: Ramon Folch
Publicado: (2000) -
First test of EBW line with 3 components at Techmeta
por: R. Folch
Publicado: (2001) -
Visit of the production line for the CMS electron beam welded conductor
por: Ramon Folch
Publicado: (2000) -
Spooling of a dummy conductor during the preliminary test of the pay-off units and the spooler for the EBW production line.
por: R. Folch
Publicado: (2000)