Cargando…
PL. Riboni and D. Campi at Gauder in Belgium.
Technical visit at Gauder in Belgium, which as a subcontractor of TECHMETA is manufacturing the spooling and despooling equipment destined to the EB line at TECHMETA.
Autor principal: | Folch, F |
---|---|
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41159 |
Ejemplares similares
-
Construction of gantries for the EB line at Gauder in Belgium.
por: Folch, R
Publicado: (2000) -
Construction of building extension at TECHMETA to accept EB line.
por: Ramon Folch
Publicado: (2000) -
Spooling of a dummy conductor during the preliminary test of the pay-off units and the spooler for the EBW production line.
por: R. Folch
Publicado: (2000) -
Visit of the production line for the CMS electron beam welded conductor
por: Ramon Folch
Publicado: (2000) -
CMS CONDUCTOR EBW PRODUCTION LINE AT TECHMETA - STATUS OF THE 17.01.01
por: Ramon Folch
Publicado: (2001)