Cargando…
Spooling of a dummy conductor during the preliminary test of the pay-off units and the spooler for the EBW production line.
Pay-off unit and spooler preliminary test for the EBW production line
Autor principal: | R. Folch |
---|---|
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41301 |
Ejemplares similares
-
CMS CONDUCTOR EBW PRODUCTION LINE AT TECHMETA - STATUS OF THE 17.01.01
por: Ramon Folch
Publicado: (2001) -
EBW line assembly status for CMS conductor
por: Techmeta
Publicado: (2000) -
First test of EBW line with 3 components at Techmeta
por: R. Folch
Publicado: (2001) -
Explosion cases of EBW assembly of conductor N°1
por: Pascal Petiot
Publicado: (2001) -
Visit of the production line for the CMS electron beam welded conductor
por: Ramon Folch
Publicado: (2000)