Insertion of suspension shoulder for the coil
Mr. Mitterer, the vactank project leader from DWE, is proud of theachieved precision. This is a view from inside the vactank. The weld remains to be done.
Autores principales: | Franz leher, DWE, Hubert Gerwig, CERN |
---|---|
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41458 |
Ejemplares similares
-
Manufacture of Outer Vactank Shell for CMS.
por: Franz Leher, DWE, et al.
Publicado: (2000) -
Right and left support feet of the Central Barrel Yoke of the CMS Detector
por: Franz Leher, DWE, et al.
Publicado: (2000) -
Ultrasonic tests of the weld between black and stainless steel in the radial rib of the of the central barrel. It constitutes the connection between vacuum tank and the barrel yoke.The plate is of 75 mm thickness and it is a full penetration weld.
por: Franz Leher, DWE, et al.
Publicado: (2000) -
Big Barrel Yoke block after painting, ready for transport, weight 40 t
por: Franz Leher, DWE, et al.
Publicado: (2000) -
Danube flood at Deggendorf
por: Franz Leher, DWE, et al.
Publicado: (1999)