Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel.
<!--HTML-->A few months after the signature of the agreement giving the go-ahead for the expansion of CERN into French territory (see Bulletin no.24/2004), work began on the Super Proton Synchrotron (SPS). Two years later, on 31 July 1974, the Robbins tunnel-boring machine excavating the SPS t...
Autor principal: | |
---|---|
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41838 |
_version_ | 1780874894910685184 |
---|---|
author | CERN PhotoLab |
author_facet | CERN PhotoLab |
author_sort | CERN PhotoLab |
collection | CERN |
description | <!--HTML-->A few months after the signature of the agreement giving the go-ahead for the expansion of CERN into French territory (see Bulletin no.24/2004), work began on the Super Proton Synchrotron (SPS). Two years later, on 31 July 1974, the Robbins tunnel-boring machine excavating the SPS tunnel returned to its starting point (see photograph). It had excavated a tunnel with a circumference of 7 kilometres, at an average depth of 40 metres below the surface. The tunnel straddled the Franco-Swiss border, making the SPS the first cross-border accelerator. More than a thousand magnets were needed to equip the ring. The civil engineering and installation work was completed in record time after only four years. The SPS was equipped with a control system which was ahead of its time, consisting of 24 small control computers distributed in the tunnel and the control room and communicating by means of a high-rate data transmission system. The main control room housed only four consoles as opposed to the banks of electronic equipment usually used at the time. On 17 June 1976, the project leader, John Adams, announced to the members of Council gathered for their June round of meetings that the first circulating proton beam at 400 GeV had been achieved. The SPS experimental programme began the following year.<br> |
id | cern-41838 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 1974 |
record_format | invenio |
spelling | cern-418382020-11-26T07:45:44Zhttp://cds.cern.ch/record/41838CERN PhotoLabArrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel.Civil Engineering and Infrastructure<!--HTML-->A few months after the signature of the agreement giving the go-ahead for the expansion of CERN into French territory (see Bulletin no.24/2004), work began on the Super Proton Synchrotron (SPS). Two years later, on 31 July 1974, the Robbins tunnel-boring machine excavating the SPS tunnel returned to its starting point (see photograph). It had excavated a tunnel with a circumference of 7 kilometres, at an average depth of 40 metres below the surface. The tunnel straddled the Franco-Swiss border, making the SPS the first cross-border accelerator. More than a thousand magnets were needed to equip the ring. The civil engineering and installation work was completed in record time after only four years. The SPS was equipped with a control system which was ahead of its time, consisting of 24 small control computers distributed in the tunnel and the control room and communicating by means of a high-rate data transmission system. The main control room housed only four consoles as opposed to the banks of electronic equipment usually used at the time. On 17 June 1976, the project leader, John Adams, announced to the members of Council gathered for their June round of meetings that the first circulating proton beam at 400 GeV had been achieved. The SPS experimental programme began the following year.<br>CERN-PHOTO-7407268CERN-CE-7407268oai:cds.cern.ch:418381974 |
spellingShingle | Civil Engineering and Infrastructure CERN PhotoLab Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel. |
title | Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel. |
title_full | Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel. |
title_fullStr | Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel. |
title_full_unstemmed | Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel. |
title_short | Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel. |
title_sort | arrival of the robbins machine in lss1 after completing the boring of the sps tunnel. |
topic | Civil Engineering and Infrastructure |
url | http://cds.cern.ch/record/41838 |
work_keys_str_mv | AT cernphotolab arrivaloftherobbinsmachineinlss1aftercompletingtheboringofthespstunnel |