Cargando…
SPS main tunnel
Main tunnel - civil engineering work completed.
Autor principal: | CERN PhotoLab |
---|---|
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41841 |
Ejemplares similares
-
Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel.
por: CERN PhotoLab
Publicado: (1974) -
Seen from LSS2, the main tunnel on the right side going to PA3, on the left side, the beginning of transfer tunnel TT20
por: CERN PhotoLab
Publicado: (1973) -
The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972.
por: CERN PhotoLab
Publicado: (1974) -
SPS switchyard
por: CERN PhotoLab
Publicado: (1974) -
North transfer tunnel
por: CERN PhotoLab
Publicado: (1972)