Cargando…

High voltage measurements on a prototype PFN for the LHC injection kickers

Two LHC injection kicker magnet systems must produce a kick of 1.3 T.m each with a flattop duration of 4.25 mu s or 6.5 mu s, a rise time of 900 ns, and a fall time of 3 mu s. The ripple in the field must be less than +or-0.5The electrical circuit of the complete system has been simulated with PSpic...

Descripción completa

Detalles Bibliográficos
Autores principales: Barnes, M J, Wait, G D, Carlier, E, Ducimetière, L, Schröder, G, Vossenberg, Eugène B
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/419553
_version_ 1780894797415841792
author Barnes, M J
Wait, G D
Carlier, E
Ducimetière, L
Schröder, G
Vossenberg, Eugène B
author_facet Barnes, M J
Wait, G D
Carlier, E
Ducimetière, L
Schröder, G
Vossenberg, Eugène B
author_sort Barnes, M J
collection CERN
description Two LHC injection kicker magnet systems must produce a kick of 1.3 T.m each with a flattop duration of 4.25 mu s or 6.5 mu s, a rise time of 900 ns, and a fall time of 3 mu s. The ripple in the field must be less than +or-0.5The electrical circuit of the complete system has been simulated with PSpice. The model includes a 66 kV resonant charging power supply (RCPS), a 5 Omega pulse forming network (PFN), a terminated 5 Omega kicker magnet, and all known parasitic quantities. Component selection for the PEN was made on the basis of models in which a theoretical field ripple of less than +or-0.1as attained. A prototype 66 kV RCPS was built at TRIUMF and shipped to CERN. A prototype 5 Omega system including a PFN, thyratron switches, and terminating resistors, was built at CERN. The system (without a kicker magnet) was assembled as designed without trimming of any PFN component values. The PFN was charged to 60 kV via the RCPS operating at 0.1 Hz. The thyratron timing was adjusted to provide a 30 kV, 5.5 mu s duration pulse on a 5 Omega terminating resistor. Measurement data is presented for the prototype PFN, connected to resistive terminators. A procedure has been developed for compensating the probe and oscilloscope amplifier calibration errors. The top of the 30 kV pulse is flat to +or-0.3after an initial oscillation of 600 ns total duration. The post-pulse period is flat to within +or-0.1after approximately 600 ns from the bottom of the falling edge of the pulse. A calculation was performed in which a measured 27.5 kV pulse with a 5.5 mu s flattop was fed into a PSpice model of a kicker magnet with a 690 ns delay length. The resultant predicted kick rise time, from 0.2to 99.8, is 834 ns and the fall time 2.94 mu s, for a field pulse with a flattop of 4.69 mu s and a ripple of less than +or-0.2(12 refs).
id cern-419553
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-4195532019-09-30T06:29:59Zhttp://cds.cern.ch/record/419553engBarnes, M JWait, G DCarlier, EDucimetière, LSchröder, GVossenberg, Eugène BHigh voltage measurements on a prototype PFN for the LHC injection kickersAccelerators and Storage RingsTwo LHC injection kicker magnet systems must produce a kick of 1.3 T.m each with a flattop duration of 4.25 mu s or 6.5 mu s, a rise time of 900 ns, and a fall time of 3 mu s. The ripple in the field must be less than +or-0.5The electrical circuit of the complete system has been simulated with PSpice. The model includes a 66 kV resonant charging power supply (RCPS), a 5 Omega pulse forming network (PFN), a terminated 5 Omega kicker magnet, and all known parasitic quantities. Component selection for the PEN was made on the basis of models in which a theoretical field ripple of less than +or-0.1as attained. A prototype 66 kV RCPS was built at TRIUMF and shipped to CERN. A prototype 5 Omega system including a PFN, thyratron switches, and terminating resistors, was built at CERN. The system (without a kicker magnet) was assembled as designed without trimming of any PFN component values. The PFN was charged to 60 kV via the RCPS operating at 0.1 Hz. The thyratron timing was adjusted to provide a 30 kV, 5.5 mu s duration pulse on a 5 Omega terminating resistor. Measurement data is presented for the prototype PFN, connected to resistive terminators. A procedure has been developed for compensating the probe and oscilloscope amplifier calibration errors. The top of the 30 kV pulse is flat to +or-0.3after an initial oscillation of 600 ns total duration. The post-pulse period is flat to within +or-0.1after approximately 600 ns from the bottom of the falling edge of the pulse. A calculation was performed in which a measured 27.5 kV pulse with a 5.5 mu s flattop was fed into a PSpice model of a kicker magnet with a 690 ns delay length. The resultant predicted kick rise time, from 0.2to 99.8, is 834 ns and the fall time 2.94 mu s, for a field pulse with a flattop of 4.69 mu s and a ripple of less than +or-0.2(12 refs).oai:cds.cern.ch:4195531999
spellingShingle Accelerators and Storage Rings
Barnes, M J
Wait, G D
Carlier, E
Ducimetière, L
Schröder, G
Vossenberg, Eugène B
High voltage measurements on a prototype PFN for the LHC injection kickers
title High voltage measurements on a prototype PFN for the LHC injection kickers
title_full High voltage measurements on a prototype PFN for the LHC injection kickers
title_fullStr High voltage measurements on a prototype PFN for the LHC injection kickers
title_full_unstemmed High voltage measurements on a prototype PFN for the LHC injection kickers
title_short High voltage measurements on a prototype PFN for the LHC injection kickers
title_sort high voltage measurements on a prototype pfn for the lhc injection kickers
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/419553
work_keys_str_mv AT barnesmj highvoltagemeasurementsonaprototypepfnforthelhcinjectionkickers
AT waitgd highvoltagemeasurementsonaprototypepfnforthelhcinjectionkickers
AT carliere highvoltagemeasurementsonaprototypepfnforthelhcinjectionkickers
AT ducimetierel highvoltagemeasurementsonaprototypepfnforthelhcinjectionkickers
AT schroderg highvoltagemeasurementsonaprototypepfnforthelhcinjectionkickers
AT vossenbergeugeneb highvoltagemeasurementsonaprototypepfnforthelhcinjectionkickers