Cargando…
Visit of the production line for the CMS electron beam welded conductor
These pictures show the status of the poduction line during the preliminary tests. A unique conductor in aluminium is used to adjust the machinnig unit and the spooling functions
Autor principal: | |
---|---|
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42016 |
_version_ | 1780874924217335808 |
---|---|
author | Ramon Folch |
author_facet | Ramon Folch |
author_sort | Ramon Folch |
collection | CERN |
description | These pictures show the status of the poduction line during the preliminary tests. A unique conductor in aluminium is used to adjust the machinnig unit and the spooling functions |
id | cern-42016 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2000 |
record_format | invenio |
spelling | cern-420162019-09-30T06:29:59Zhttp://cds.cern.ch/record/42016Ramon FolchVisit of the production line for the CMS electron beam welded conductorMagnetThese pictures show the status of the poduction line during the preliminary tests. A unique conductor in aluminium is used to adjust the machinnig unit and the spooling functionsCMS-PHO-MAGNET-2000-078oai:cds.cern.ch:420162000-12-04 |
spellingShingle | Magnet Ramon Folch Visit of the production line for the CMS electron beam welded conductor |
title | Visit of the production line for the CMS electron beam welded conductor |
title_full | Visit of the production line for the CMS electron beam welded conductor |
title_fullStr | Visit of the production line for the CMS electron beam welded conductor |
title_full_unstemmed | Visit of the production line for the CMS electron beam welded conductor |
title_short | Visit of the production line for the CMS electron beam welded conductor |
title_sort | visit of the production line for the cms electron beam welded conductor |
topic | Magnet |
url | http://cds.cern.ch/record/42016 |
work_keys_str_mv | AT ramonfolch visitoftheproductionlineforthecmselectronbeamweldedconductor |