Cargando…
CMS CONDUCTOR EBW PRODUCTION LINE AT TECHMETA - STATUS OF THE 17.01.01
PICTURES TAKEN DURING THE CERN/CMS/ETHZ VISIT ON THE 17.01.01. THE LINE IS READY TO RUN PROCESSING A UNIQUE FULL SECTION DUMY CONDUCTOR TO FINALISE THE SETUP OF THE EBW UNIT AND THE MACHINING UNIT.
Autor principal: | Ramon Folch |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42070 |
Ejemplares similares
-
First test of EBW line with 3 components at Techmeta
por: R. Folch
Publicado: (2001) -
EBW line assembly status for CMS conductor
por: Techmeta
Publicado: (2000) -
Spooling of a dummy conductor during the preliminary test of the pay-off units and the spooler for the EBW production line.
por: R. Folch
Publicado: (2000) -
CMS conductor manufacturing at Techmeta by elecron beam welding
por: Benoit CURE
Publicado: (2001) -
Construction of building extension at TECHMETA to accept EB line.
por: Ramon Folch
Publicado: (2000)