Cargando…

Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.

CSC installation fixture test at PSL on January 18, 2001. Photos show the sequence of steps for CSC installation.

Detalles Bibliográficos
Autores principales: Farshid Feyzi, Bill Mason
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/42075
_version_ 1780874930384011264
author Farshid Feyzi
Bill Mason
author_facet Farshid Feyzi
Bill Mason
author_sort Farshid Feyzi
collection CERN
description CSC installation fixture test at PSL on January 18, 2001. Photos show the sequence of steps for CSC installation.
id cern-42075
institution Organización Europea para la Investigación Nuclear
publishDate 2001
record_format invenio
spelling cern-420752019-09-30T06:29:59Zhttp://cds.cern.ch/record/42075Farshid FeyziBill MasonPictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.Muon DetectorCSC installation fixture test at PSL on January 18, 2001. Photos show the sequence of steps for CSC installation.CMS-PHO-MUON-2001-001oai:cds.cern.ch:420752001-01-18
spellingShingle Muon Detector
Farshid Feyzi
Bill Mason
Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.
title Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.
title_full Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.
title_fullStr Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.
title_full_unstemmed Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.
title_short Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.
title_sort pictures showing the test of csc installation fixture. the csc is fully balanced and free to rotate to any angle. after csc is attached to mounts, fixture is rebalanced and removed. electrical limits stops are set at with or without chamber balance points.
topic Muon Detector
url http://cds.cern.ch/record/42075
work_keys_str_mv AT farshidfeyzi picturesshowingthetestofcscinstallationfixturethecscisfullybalancedandfreetorotatetoanyangleaftercscisattachedtomountsfixtureisrebalancedandremovedelectricallimitsstopsaresetatwithorwithoutchamberbalancepoints
AT billmason picturesshowingthetestofcscinstallationfixturethecscisfullybalancedandfreetorotatetoanyangleaftercscisattachedtomountsfixtureisrebalancedandremovedelectricallimitsstopsaresetatwithorwithoutchamberbalancepoints