Cargando…
Pictures showing the test of CSC installation fixture. The CSC is fully balanced and free to rotate to any angle. After CSC is attached to mounts, fixture is rebalanced and removed. Electrical limits stops are set at with or without chamber balance points.
CSC installation fixture test at PSL on January 18, 2001. Photos show the sequence of steps for CSC installation.
Autores principales: | Farshid Feyzi, Bill Mason |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42075 |
Ejemplares similares
-
CSC installation fixture finished
por: Farshid Feyzi, et al.
Publicado: (2001) -
Post for CSC installed on YE-2
por: Dan Wenman
Publicado: (2003) -
First test of mounting a CSC on YE-2
por: Walter van Doninck
Publicado: (2001) -
CSC posts ready for shipment
por: Dan Wenman
Publicado: (2002) -
CMS Cathode Strip Chambers (CSC) extraction
por: Lapka, Marzena
Publicado: (2019)