Cargando…
ALBERTA - HEC test beam set-up in June 1999
Photo1 - HEC 2 (rear) being set up in the "clean" room. Photo2 - HEC 2 (rear) being craned onto rotating C. Photo3 - HEC 2 (rear) being rotated. Photo4 - A now well rotated HEC 2 (rear) is being craned off the C. Photo5 - HEC 2 (rear) installed in the cryostat. Photo6 - Part of the basic f...
Autor principal: | Vinter, M. |
---|---|
Lenguaje: | ENG |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42137 |
Ejemplares similares
-
Preparation for the HEC 1999 Test Beam (photos obtained from TRIUMF)
Publicado: (1999) -
Preparation of HEC Serial Modules for Beam and Cold Tests at CERN in 2000
por: Fischer, A.
Publicado: (2001) -
Photos of ATLAS-HEC Electronics Miscellaneous Photos from MPI (1999-2000) A. Kiryunin
por: Laskus, H., et al.
Publicado: (2000) -
ATLAS HEC PHOTOS TRIUMF
Publicado: (1997) -
Photos from MPI: Module installation at CERN for 1999 Test Beam
Publicado: (1999)