Cargando…
Measurement of the location of tie-bar shoulders
The inner vactank is machined on a length of 13m at the location of the rails for HCAL. in addition at one side the inner vactank has shoulders to lodge the M48 tie-bars that will guarantee the fixation to the swivelling platform actually produced at HANJUNG Company in South Korea
Autor principal: | Hubert Gerwig |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42186 |
Ejemplares similares
-
One long tie bar broken after 3 days because of hydrogen contamination.
por: H. Gerwig
Publicado: (2000) -
Test to rupture of titanium tie-bars for the coil suspension.
por: Saclay
Publicado: (2000) -
Insertion of suspension shoulder for the coil
por: Franz leher, DWE, et al.
Publicado: (2000) -
Intergranular decohesion due to hydrogen contamination in barrel tie bars.
Publicado: (2000) -
The outer vactank, an object of 7.6m diameter and 13m length is built up of three cylindrical parts. The central part that is integral part of the central barrel and the the extension on either side each one 4.5m long. These extensions house the shoulders that will support and prestress the CMS Coil. To weld the extensions onto the central part a full penetration weld of 24m length and 45 mm thickness has to be done by hand from inside and outside the vacuum tank and its deformation is controled permanently.
por: Hubert Gerwig
Publicado: (2001)