Cargando…
Beam Loading Compensation of the CTF II Drive Beam using Idle Cavities
A pair of idle cavity structures has been built at the Alfvén Laboratory, KTH, Stockholm for a second order compensation of the drive beam energy spread in the CLIC Test Facility II (CTF II) at CERN, Geneve. In this note, the theoretical background and the cavity design, together with the experiment...
Autores principales: | Rosander, S, Braun, H, Valentini, V |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/421953 |
Ejemplares similares
-
Second Order Beam-Loading Compensation in the Drive-Beam Accelerator of the CLIC Test Facility
por: Valentini, M, et al.
Publicado: (2000) -
Two-frequency beam-loading compensation in the drive-beam accelerator of the CLIC test facility
por: Braun, HH, et al.
Publicado: (1999) -
Two frequency beam-loading compensation in the drive-beam accelerator of the CLIC Test Facility
por: Braun, Hans Heinrich, et al.
Publicado: (1999) -
Simulation of the CTF drive beam line and comparison with the experiment
por: Riche, JA, et al.
Publicado: (2000) -
Minutes of CTF-II Drive Beam BPM Meeting on 7.6.1995
por: Braun, H
Publicado: (1995)