Cargando…
Record 5: Future Assembly Area for the End-Cap Toroid in Hall 191: Airpads test set-up, new door
Photo - H191 ECTassy (Background) Photo - H191 Airpads (Background) Photo - H191 Door (Background)
Autor principal: | Witzeling, W. |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42245 |
Ejemplares similares
-
Record 3: Future Assembly Area for the Barrel Toroid in Hall 180
por: Witzeling, W.
Publicado: (2001) -
End-cap Toroid
por: Marcelloni Oliveira, C
Publicado: (2005) -
Barrel Toroid Test Area in Hall 180: B-zero Coil and Cryogenics Set-Up
por: Witzeling, W.
Publicado: (2001) -
Record 6: Tile Calorimeter Storage Areas in Hall 185 and Hall 175
por: Witzeling, W.
Publicado: (2001) -
Transport of 1/2 End-Caps between building 180 to building 191
por: Sylvie Prodon
Publicado: (2006)