Cargando…
ATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current)
Step 5 - Welding tacl_weld - Our Welder from Nucor (Tuscola, IL) tack-welds each of the four corners of the submodule. The submodule can then be safely lifted out of the stacking fixture by crane. Step 5 - WELDING tack_weld - Stan Lamb, our welder from Nucor (Tuscola, IL) tack-welds each of the four...
Autor principal: | |
---|---|
Lenguaje: | ENG |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42361 |
_version_ | 1780874955751161856 |
---|---|
author | Errede, Steve |
author_facet | Errede, Steve |
author_sort | Errede, Steve |
collection | CERN |
description | Step 5 - Welding tacl_weld - Our Welder from Nucor (Tuscola, IL) tack-welds each of the four corners of the submodule. The submodule can then be safely lifted out of the stacking fixture by crane. Step 5 - WELDING tack_weld - Stan Lamb, our welder from Nucor (Tuscola, IL) tack-welds each of the four corners of the submodule. The submodule can then be safely lifted out of the stacking fixture by crane. Photo 9 - This is our handy Submodule Final Welding Jig designed and built by our very own Fred Cogswell. Photo 10 - A submodule being lowered into the welding jig for final welding. Photo 11 - Stan Lamb final-welds the submodule. The welding jig saves us an enormous amount of time, since the submodule can be easily be rotated by hand for each weld. |
id | cern-42361 |
institution | Organización Europea para la Investigación Nuclear |
language | ENG |
publishDate | 2000 |
record_format | invenio |
spelling | cern-423612019-09-30T06:29:59Zhttp://cds.cern.ch/record/42361ENGErrede, SteveATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current)ATLASStep 5 - Welding tacl_weld - Our Welder from Nucor (Tuscola, IL) tack-welds each of the four corners of the submodule. The submodule can then be safely lifted out of the stacking fixture by crane. Step 5 - WELDING tack_weld - Stan Lamb, our welder from Nucor (Tuscola, IL) tack-welds each of the four corners of the submodule. The submodule can then be safely lifted out of the stacking fixture by crane. Photo 9 - This is our handy Submodule Final Welding Jig designed and built by our very own Fred Cogswell. Photo 10 - A submodule being lowered into the welding jig for final welding. Photo 11 - Stan Lamb final-welds the submodule. The welding jig saves us an enormous amount of time, since the submodule can be easily be rotated by hand for each weld.ATL-PHO-TILECAL-2001-006oai:cds.cern.ch:423612000 |
spellingShingle | ATLAS Errede, Steve ATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current) |
title | ATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current) |
title_full | ATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current) |
title_fullStr | ATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current) |
title_full_unstemmed | ATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current) |
title_short | ATLAS TileCal Sub-Module Production at UIUC - Production Submodule Photos (current) |
title_sort | atlas tilecal sub-module production at uiuc - production submodule photos (current) |
topic | ATLAS |
url | http://cds.cern.ch/record/42361 |
work_keys_str_mv | AT erredesteve atlastilecalsubmoduleproductionatuiucproductionsubmodulephotoscurrent |