A 0.5 MW/10 Hz option of the spallation source AUSTRON
In 1993-94 a feasibility study for AUSTRON, a neutron spallation source, was made on behalf of the Austrian Ministry of Science and Research. At that time, the machine was synchrotron cycling at 25 Hz and delivering an average beam power of 205 kW at 1.6 GeV. An option to double the power by doublin...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/424100 |
Sumario: | In 1993-94 a feasibility study for AUSTRON, a neutron spallation source, was made on behalf of the Austrian Ministry of Science and Research. At that time, the machine was synchrotron cycling at 25 Hz and delivering an average beam power of 205 kW at 1.6 GeV. An option to double the power by doubling the frequency was foreseen. Now a more ambitious development of the original concept is proposed that aims at 0.5 MW at 1.6 GeV, pulsed at either 50 Hz or 10 Hz. The slow repetition rate is achieved by the addition of a storage ring holding four consecutive (single bunch) pulses from the 50 Hz synchrotron until a fifth pulse is accelerated and transferred to the target with the four stored ones. In this way, an energy per pulse of 50 kJ (one half of the pulse energy of the 5 MW ESS) is obtained, yielding about 3.5*10/sup 16/ thermal neutrons/(s cm/sup 2/). This peak flux matches well a number of innovative instruments and allows unprecedented resolution for some more conventional ones. On August 20, 1998, the Austrian Government has unanimously decided to contribute one third of the total cost of the facility and invites international partners to participate. (13 refs). |
---|