Cargando…
A 0.5 MW/10 Hz option of the spallation source AUSTRON
In 1993-94 a feasibility study for AUSTRON, a neutron spallation source, was made on behalf of the Austrian Ministry of Science and Research. At that time, the machine was synchrotron cycling at 25 Hz and delivering an average beam power of 205 kW at 1.6 GeV. An option to double the power by doublin...
Autores principales: | Bryant, P J, Griesmayer, E, Jericha, E, Rauch, H, Regler, Meinhard, Schönauer, Horst Otto |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/424100 |
Ejemplares similares
-
New Layout of the Rings for the 0.5 MW / 10 Hz / 50 Hz AUSTRON Spallation Source
por: Benedikt, Michael, et al.
Publicado: (2001) -
New layout of the rings for the 0.5 MW / 10 HZ / 50 HZ austron spallation source
por: Benedikt, M, et al.
Publicado: (2001) -
The austron 500 kW/10 Hz option: addition of a 10 Hz storage ring to the austron 50 Hz rapid cycling synchrotron
por: Schönauer, H
Publicado: (1999) -
The accelerators for the austron spallation source
Publicado: (1994) -
Med-AUSTRON: Machbarkeitsstudie
por: Regler, Meinhard, et al.
Publicado: (1998)