Cargando…
Visit to Minsk in NCPHEP institute and Mzor company
This visit was planed to check and witness some mechanical test on the brackets which will attach the HE calorimeter on the YE1 (end cap nose). These tests will define a protocol which will be applied on all other brackets to validate them through our quality assurance system.
Autor principal: | Pascal Petiot |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42414 |
Ejemplares similares
-
Construction of the HE absorber at MZOR, Minsk, Bielorussia.
por: MZOR
Publicado: (2000) -
End of pre-assembly of HE-1 at MZOR in Minsk.
por: A. Zarubin
Publicado: (2001) -
HE absorber at MZOR with 13 layers.
por: MZOR
Publicado: (2000) -
Arrival of HE support tube from Minsk
por: L. Veillet
Publicado: (2002) -
A group from Moscow and Minsk, helped by the team of CMS SX5 hall and crane drivers from DBS, is assembling the first Hadronic endcap calorimeter in SX5.
por: Service de Presse
Publicado: (2002)