Cargando…
Factory acceptance of the compressor skids at Samifi-Babcock. All pictures show the second stage compressor skid.
Most recent pictures taken during the factory acceptance of the compressor skids at Samifi-Babcock. All pictures show the second stage compressor skid. Picture two was taken during the leak tests and shows all the pockets around flanges and valves.
Autor principal: | G. Perinic |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42425 |
Ejemplares similares
-
Compressor station of the external cryogenic system during installation.
Publicado: (2002) -
The Influence of Road Geometry on Vehicle Rollover and Skidding
por: Yin, Yanna, et al.
Publicado: (2020) -
Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''
por: Johns, B R
Publicado: (1999) -
Plant Species Recovery on a Compacted Skid Road
por: Demir, Murat, et al.
Publicado: (2008) -
Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
por: Koch, M R
Publicado: (1999)