Cargando…
ATLAS HEC PHOTOS TRIUMF
Photo 1 - Removal of a glued foil from the glue press. The foils still need to be cut with a steel rule die and the HV pins soldered on. Photo 2 - Inspection of EST foil. Photo 3 - Placing the first plate of the front Module 0 on the stacking table with the tie-rods in place. Photo 4 - As each gap i...
Lenguaje: | ENG |
---|---|
Publicado: |
1997
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42432 |
Ejemplares similares
-
Preparation for the HEC 1999 Test Beam (photos obtained from TRIUMF)
Publicado: (1999) -
Photos of ATLAS-HEC Electronics Miscellaneous Photos from MPI (1999-2000) A. Kiryunin
por: Laskus, H., et al.
Publicado: (2000) -
ATLAS HEC Photographs - Pictures of the TRIUMF Production Site
por: Wielers, M.
Publicado: (2000) -
ALBERTA - HEC test beam set-up in June 1999
por: Vinter, M.
Publicado: (1999) -
Preparation of HEC Serial Modules for Beam and Cold Tests at CERN in 2000
por: Fischer, A.
Publicado: (2001)