Cargando…
Preparation for the HEC 1999 Test Beam (photos obtained from TRIUMF)
Photo1 - Three mated modules after rotation are ready to go in the cryostat. Photo2 - The mated modules on the rotator (at 45 degrees). Photo3 - The HEC-2 modules with all the outer connecting bars in place. Photo4 - The HEC-2 modules with two connecting bars still missing. Photo5 - the happy assemb...
Lenguaje: | ENG |
---|---|
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42435 |