Cargando…

Preparation for the HEC 1999 Test Beam (photos obtained from TRIUMF)

Photo1 - Three mated modules after rotation are ready to go in the cryostat. Photo2 - The mated modules on the rotator (at 45 degrees). Photo3 - The HEC-2 modules with all the outer connecting bars in place. Photo4 - The HEC-2 modules with two connecting bars still missing. Photo5 - the happy assemb...

Descripción completa

Detalles Bibliográficos
Lenguaje:ENG
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/42435

Ejemplares similares