Cargando…
Truck containing 22 boxes (15 tons) with the CMS DT field electrode production line leavingt INFN Torino for Dubna
A truck containing 22 boxes (15 tons) with the CMS DT field electrode production line has left INFN Torino and will be in Dubna in approximately 1 week.
Autor principal: | Amadeo Staiano |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42442 |
Ejemplares similares
-
Images of CMS Muons - Drift Tubes (DT)
por: Puerta-Pelayo, J, et al.
Publicado: (2008) -
Installation of last DT+RPC packages for the muon barrel detector of CMS
por: Jesus Puerta-Pelayo
Publicado: (2007) -
Installation of ME1/1 Dubna chambers on the endcap disk YE-1
Publicado: (2005) -
First test of a CMS DT chamber equipped with full electronics in a muon beam
por: Jesus Puerta-Pelayo
Publicado: (2003) -
Last Muon DT SuperLayer glued in Legnaro
por: Paolo Checchia
Publicado: (2005)