Cargando…
Installation of sdcaffoldings for HB-1 assembly.
First mounting of Axeo scaffodings for the assembly of HB-1
Autor principal: | Luciebn Veillet |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42453 |
Ejemplares similares
-
Preparation of slab for counting room installation
por: L. Veillet
Publicado: (2002) -
Delivery and assembly of the 80 T cranes in SX5
por: L. Veillet
Publicado: (2000) -
Real Size CMS poster at P5 installation
por: Hoch, Michael
Publicado: (2012) -
Safety installations and infrastructure at CERN P5/ CMS
por: Hoch, Michael
Publicado: (2012) -
Posible Axeo cherry picker to be used in UX5 and SX5.
por: Lucien Veillet
Publicado: (2001)