The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.

TI2 will have an important role to play even before the LHC starts up in 2006, since it is along this tunnel that the new accelerator's over 1300 main dipole magnets will be transported into the ring.

Detalles Bibliográficos
Lenguaje:ENG
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/42544
_version_ 1780874977936932864
collection CERN
description TI2 will have an important role to play even before the LHC starts up in 2006, since it is along this tunnel that the new accelerator's over 1300 main dipole magnets will be transported into the ring.
id cern-42544
institution Organización Europea para la Investigación Nuclear
language ENG
publishDate 2001
record_format invenio
spelling cern-425442019-09-30T06:29:59Zhttp://cds.cern.ch/record/42544ENGThe TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.Civil Engineering and InfrastructureTI2 will have an important role to play even before the LHC starts up in 2006, since it is along this tunnel that the new accelerator's over 1300 main dipole magnets will be transported into the ring.BUL-PHO-2001-028oai:cds.cern.ch:425442001-05-15
spellingShingle Civil Engineering and Infrastructure
The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
title The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
title_full The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
title_fullStr The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
title_full_unstemmed The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
title_short The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
title_sort ti2 tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the sps to point 2 of the lep/lhc ring.
topic Civil Engineering and Infrastructure
url http://cds.cern.ch/record/42544