Cargando…
Preparation for gluing of Carbon prototype MAB at INEGI, Porto
MAB's will assure the alignment of the CMS detector. It is equipped with muon cameras, measuring the position of the barrel muon stations and at the same time linking via the link elements, connecting the barrel muon detectors with the Tracker. In addition there is a connection with the endcap....
Autores principales: | Miguel Moreira, Porto, INEGI, Hubert Gerwig, CERN |
---|---|
Lenguaje: | ENG |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42579 |
Ejemplares similares
-
MAB Prototype ready to be glued at INEGI
por: Hubert Gerwig
Publicado: (2001) -
Last Muon DT SuperLayer glued in Legnaro
por: Paolo Checchia
Publicado: (2005) -
Endcap Muon Low Voltage Power Supply Prototype
por: Farshid Feyzi
Publicado: (2002) -
MWPC cathode plane. Prototype built in Oct 2000
por: Schneider, T
Publicado: (2000) -
MWPC prototype built in Oct 2000
por: Schneider, T
Publicado: (2000)