Cargando…
View of SX hall beginning of March 2002.
View of the SX hall with the swiveling platform being assembled. The inner vactank is ready inside the hall.
Autor principal: | |
---|---|
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/42692 |
Sumario: | View of the SX hall with the swiveling platform being assembled. The inner vactank is ready inside the hall. |
---|