Cargando…
Installation of diving boards
Assembly of diving boards to support metallic structures
Autor principal: | L. Veillet |
---|---|
Lenguaje: | ENG |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/43003 |
Ejemplares similares
-
Installation of support disk of ME1/1 and first slice of HE-1
por: Lucien Veillet
Publicado: (2002) -
Manufacture of grooves for installing magnetic measurement loops on YE-2
por: L. Veillet / EP
Publicado: (2001) -
Installation of the intermediate cryostat.
por: Goran Perinic
Publicado: (2003) -
Cryogenic cold box during installation.
por: Goran Perinic
Publicado: (2003) -
Helium transfer line installation details.
por: G. Perinic
Publicado: (2007)