Arrival of the cold box for the cryogenic refrigeration plant and installation in building SHL5.
The pictures show the arrival of the cold box and the installation of both the cold box and the valve panel in building SHL5. The installation was achieved by lowering the components through an opening in the roof which had been specially forseen for this operation.
Autores principales: | Goran Perinic, Thierry Dupont |
---|---|
Lenguaje: | ENG |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/43011 |
Ejemplares similares
-
Cryogenic cold box during installation.
por: Goran Perinic
Publicado: (2003) -
Transfer of the cold box from SHL55 to USC55.
por: G. Perinic
Publicado: (2007) -
Transfer of the cold box and its ancilliaries from SHL55 to USC55.
por: G. Perinic
Publicado: (2007) -
Arrival of Cold Box
por: L. Veillet
Publicado: (2002) -
Montage photograph: Cryogenic components mounted on top of the central yoke barrel in the configuration for the acceptance tests of the helium refrigeration system comprising the intermediate cryostat (right), the test cryostat (left) and the cryogenic transfer lines.
por: Goran Perinic
Publicado: (2003)