Cargando…
Load tests of swiveling tooling for the coil, held at CERN, point 5 on the 3rd of July, 2002.
Load tests of swiveling tooling for the coil, held at CERN, point 5 on the 3rd of July, 2002.
Autor principal: | Alain PAYN |
---|---|
Lenguaje: | ENG |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/43074 |
Ejemplares similares
-
CMS Swiveling Platform for Coil and Inner Vacuum Tank Static Load Test 350 t performed at Dong Yang (South Korea) 2001-08-21 to 23
por: Alain PAYN
Publicado: (2001) -
Production of Swiveling Platform in Korea - Visit during Machining - 12th/14th of June, 2001
por: Alain PAYN
Publicado: (2001) -
Coil cross-section Mock-up done by CEA / Saclay April 2002
por: A. PAYN
Publicado: (2002) -
Production of Swiveling platform - Korea Visit during first stage of production 25th of April, 2001
por: A. PAYN, et al.
Publicado: (2001) -
CMS solenoid swivelling
por: Bruno LEVESY
Publicado: (2005)