Cargando…
First tests of DT insertion in SX5.
A first test of insertion has been perfomed with a MB2 chamber, and the tooling was presented for MB3 and MB4.
Autor principal: | Massimo Benettoni |
---|---|
Lenguaje: | ENG |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/43115 |
Ejemplares similares
-
Commissioning activities of CMS Drift Tubes (DT) chambers at SX5
por: Domenico Dattola
Publicado: (2005) -
Images of CMS Muons - Drift Tubes (DT)
por: Puerta-Pelayo, J, et al.
Publicado: (2008) -
First test of a CMS DT chamber equipped with full electronics in a muon beam
por: Jesus Puerta-Pelayo
Publicado: (2003) -
Last Muon DT SuperLayer glued in Legnaro
por: Paolo Checchia
Publicado: (2005) -
First DT+RPC chambers installation round in the UX5 cavern
por: Jesus Puerta-Pelayo
Publicado: (2007)