Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system

The European Laboratory for Particle Physics (CERN) is constructing the Large Hadron Collider (LHC). Two counter-rotating proton beams will be injected into the LHC at an energy of 450 GeV by two kicker magnet systems, producing magnetic field pulses of approximately 900 ns rise time and 6.6 mu s fl...

Descripción completa

Detalles Bibliográficos
Autores principales: Barnes, M J, Wait, G D, Carlier, E, Ducimetière, L, Schröder, G, Vossenberg, Eugène B
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/431464
_version_ 1780895268222271488
author Barnes, M J
Wait, G D
Carlier, E
Ducimetière, L
Schröder, G
Vossenberg, Eugène B
author_facet Barnes, M J
Wait, G D
Carlier, E
Ducimetière, L
Schröder, G
Vossenberg, Eugène B
author_sort Barnes, M J
collection CERN
description The European Laboratory for Particle Physics (CERN) is constructing the Large Hadron Collider (LHC). Two counter-rotating proton beams will be injected into the LHC at an energy of 450 GeV by two kicker magnet systems, producing magnetic field pulses of approximately 900 ns rise time and 6.6 mu s flat top duration with a ripple of less than +or-0.5Both injection systems are composed of 4 travelling wave kicker magnets of 2.17 m length each, powered by pulse forming networks (PFNs). To achieve the high-required kick strength of 1.2 Tm, for a compact and cost efficient design, a characteristic impedance of 5 Ohms has been chosen. The design strategy for the magnets and generators has been defined after detailed analysis of existing systems. The electrical circuit has been optimised using the circuit analysis software PSpice. Most known parasitics have been modelled. A prototype PFN has been constructed at CERN and successfully tested at 60 kV. A calibration procedure has been developed and utilised for obtaining correction data for a high voltage probe and oscilloscope amplifier. Measurements carried out with a precision of approximately +or-0.1 From how that the prototype PFN conforms to the specifications and the PSpice predictions. (11 refs).
id cern-431464
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-4314642019-09-30T06:29:59Zhttp://cds.cern.ch/record/431464engBarnes, M JWait, G DCarlier, EDucimetière, LSchröder, GVossenberg, Eugène BConstruction and 60 kV tests of the prototype pulser for the LHC injection kicker systemAccelerators and Storage RingsThe European Laboratory for Particle Physics (CERN) is constructing the Large Hadron Collider (LHC). Two counter-rotating proton beams will be injected into the LHC at an energy of 450 GeV by two kicker magnet systems, producing magnetic field pulses of approximately 900 ns rise time and 6.6 mu s flat top duration with a ripple of less than +or-0.5Both injection systems are composed of 4 travelling wave kicker magnets of 2.17 m length each, powered by pulse forming networks (PFNs). To achieve the high-required kick strength of 1.2 Tm, for a compact and cost efficient design, a characteristic impedance of 5 Ohms has been chosen. The design strategy for the magnets and generators has been defined after detailed analysis of existing systems. The electrical circuit has been optimised using the circuit analysis software PSpice. Most known parasitics have been modelled. A prototype PFN has been constructed at CERN and successfully tested at 60 kV. A calibration procedure has been developed and utilised for obtaining correction data for a high voltage probe and oscilloscope amplifier. Measurements carried out with a precision of approximately +or-0.1 From how that the prototype PFN conforms to the specifications and the PSpice predictions. (11 refs).oai:cds.cern.ch:4314641999
spellingShingle Accelerators and Storage Rings
Barnes, M J
Wait, G D
Carlier, E
Ducimetière, L
Schröder, G
Vossenberg, Eugène B
Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system
title Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system
title_full Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system
title_fullStr Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system
title_full_unstemmed Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system
title_short Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system
title_sort construction and 60 kv tests of the prototype pulser for the lhc injection kicker system
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/431464
work_keys_str_mv AT barnesmj constructionand60kvtestsoftheprototypepulserforthelhcinjectionkickersystem
AT waitgd constructionand60kvtestsoftheprototypepulserforthelhcinjectionkickersystem
AT carliere constructionand60kvtestsoftheprototypepulserforthelhcinjectionkickersystem
AT ducimetierel constructionand60kvtestsoftheprototypepulserforthelhcinjectionkickersystem
AT schroderg constructionand60kvtestsoftheprototypepulserforthelhcinjectionkickersystem
AT vossenbergeugeneb constructionand60kvtestsoftheprototypepulserforthelhcinjectionkickersystem