Toroid magnet test facility
Because of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a ded...
Lenguaje: | eng |
---|---|
Publicado: |
2002
|
Acceso en línea: | http://cds.cern.ch/record/43412 |
_version_ | 1780875103615057920 |
---|---|
collection | CERN |
description | Because of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a dedicated test facility. |
id | cern-43412 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2002 |
record_format | invenio |
spelling | cern-434122019-09-30T06:29:59Zhttp://cds.cern.ch/record/43412engToroid magnet test facilityBecause of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a dedicated test facility.Poster-2002-006oai:cds.cern.ch:434122002-07-24 |
spellingShingle | Toroid magnet test facility |
title | Toroid magnet test facility |
title_full | Toroid magnet test facility |
title_fullStr | Toroid magnet test facility |
title_full_unstemmed | Toroid magnet test facility |
title_short | Toroid magnet test facility |
title_sort | toroid magnet test facility |
url | http://cds.cern.ch/record/43412 |