Toroid magnet test facility

Because of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a ded...

Descripción completa

Detalles Bibliográficos
Lenguaje:eng
Publicado: 2002
Acceso en línea:http://cds.cern.ch/record/43412
_version_ 1780875103615057920
collection CERN
description Because of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a dedicated test facility.
id cern-43412
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-434122019-09-30T06:29:59Zhttp://cds.cern.ch/record/43412engToroid magnet test facilityBecause of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a dedicated test facility.Poster-2002-006oai:cds.cern.ch:434122002-07-24
spellingShingle Toroid magnet test facility
title Toroid magnet test facility
title_full Toroid magnet test facility
title_fullStr Toroid magnet test facility
title_full_unstemmed Toroid magnet test facility
title_short Toroid magnet test facility
title_sort toroid magnet test facility
url http://cds.cern.ch/record/43412