Toroid magnet test facility
Because of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a ded...
Lenguaje: | eng |
---|---|
Publicado: |
2002
|
Acceso en línea: | http://cds.cern.ch/record/43412 |
Ejemplares similares
-
The CERN Cryogenic Test Facility for the Atlas Barrel Toroid Magnets
por: Haug, F, et al.
Publicado: (1999) -
The CERN cryogenic test facility for the ATLAS barrel toroid magnets
por: Haug, F, et al.
Publicado: (2000) -
The Common Cryogenic Test Facility for the Atlas Barrel and End-Cap Toroid Magnet
por: Delruelle, N, et al.
Publicado: (2004) -
The common cryogenic test facility for the ATLAS barrel and end-cap toroid magnets
por: Delruelle, N, et al.
Publicado: (2004) -
Commissioning Test of ATLAS End-Cap Toroidal Magnets
por: Dudarev, A, et al.
Publicado: (2009)