Cargando…

Assembly of HB+1 with 5 wedges.

On 16 October 2002, 5 wedges have been assembled and measured, including the repaired wedge 16. All is OK.

Detalles Bibliográficos
Autor principal: Alain Renoux
Lenguaje:ENG
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/43457
_version_ 1780875111738376192
author Alain Renoux
author_facet Alain Renoux
author_sort Alain Renoux
collection CERN
description On 16 October 2002, 5 wedges have been assembled and measured, including the repaired wedge 16. All is OK.
id cern-43457
institution Organización Europea para la Investigación Nuclear
language ENG
publishDate 2002
record_format invenio
spelling cern-434572019-09-30T06:29:59Zhttp://cds.cern.ch/record/43457ENGAlain RenouxAssembly of HB+1 with 5 wedges.Hadronic CalorimeterOn 16 October 2002, 5 wedges have been assembled and measured, including the repaired wedge 16. All is OK.CMS-PHO-HCAL-2002-007oai:cds.cern.ch:434572002-10-16
spellingShingle Hadronic Calorimeter
Alain Renoux
Assembly of HB+1 with 5 wedges.
title Assembly of HB+1 with 5 wedges.
title_full Assembly of HB+1 with 5 wedges.
title_fullStr Assembly of HB+1 with 5 wedges.
title_full_unstemmed Assembly of HB+1 with 5 wedges.
title_short Assembly of HB+1 with 5 wedges.
title_sort assembly of hb+1 with 5 wedges.
topic Hadronic Calorimeter
url http://cds.cern.ch/record/43457
work_keys_str_mv AT alainrenoux assemblyofhb1with5wedges