Cargando…
CV/TCR Control System Perspectives
At present, 35% of the CERN technical infrastructure points being monitored by the TCR are related to CV facilities. The adaptation of the CV systems to the LHC and the new experimental areas is leading to a re-engineering of all their control and monitoring systems in order to reach the more demand...
Autor principal: | Morodo-Testa, M C |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/435826 |
Ejemplares similares
-
TCR remote monitoring for the LHC technical infrastructure
por: Blanc, D, et al.
Publicado: (2003) -
Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC
por: Body, Y, et al.
Publicado: (2001) -
Is the CERN recommended SCADA useable for the ST division?
por: Sollander, P, et al.
Publicado: (2001) -
TCR as supervisor of technical systems
por: Laeger, H
Publicado: (1998) -
TCR industrial system integration strategy
por: Bartolomé, R, et al.
Publicado: (1999)