LHC Electrical Installations: Status Report

During 1999 the ST-EL group started detailed preparations for the electrical installations for the LHC. The areas of activity have been zone 18, access point 5 and the preparations around BA 4 and BA 7. Another activity performed during 1999 was the laying of the 18 kV cable link from LHC 6 to LHC 5...

Descripción completa

Detalles Bibliográficos
Autor principal: Pedersen, J
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:http://cds.cern.ch/record/435997
_version_ 1780895421408739328
author Pedersen, J
author_facet Pedersen, J
author_sort Pedersen, J
collection CERN
description During 1999 the ST-EL group started detailed preparations for the electrical installations for the LHC. The areas of activity have been zone 18, access point 5 and the preparations around BA 4 and BA 7. Another activity performed during 1999 was the laying of the 18 kV cable link from LHC 6 to LHC 5, which will supply the CMS experiment. The intensified study work has, since the end of summer 1999, been effectively supported by an additional study office, staffed by contractor's personnel. Detailed studies and work require a clear definition of tasks. This has been developed within the EL-NP section and will be refined as the needs develop. The possibility of an ST-EL support for the cabling of the LHC experiments is currently being investigated. This is an additional field of activity, not earlier covered by the ST division. An important aspect of any status report is the budget follow-up. The very strict financial framework for the LHC project requires constant vigilance, even for the smaller budget volumes.
id cern-435997
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2000
record_format invenio
spelling cern-4359972019-09-30T06:29:59Zhttp://cds.cern.ch/record/435997engPedersen, JLHC Electrical Installations: Status ReportEngineeringDuring 1999 the ST-EL group started detailed preparations for the electrical installations for the LHC. The areas of activity have been zone 18, access point 5 and the preparations around BA 4 and BA 7. Another activity performed during 1999 was the laying of the 18 kV cable link from LHC 6 to LHC 5, which will supply the CMS experiment. The intensified study work has, since the end of summer 1999, been effectively supported by an additional study office, staffed by contractor's personnel. Detailed studies and work require a clear definition of tasks. This has been developed within the EL-NP section and will be refined as the needs develop. The possibility of an ST-EL support for the cabling of the LHC experiments is currently being investigated. This is an additional field of activity, not earlier covered by the ST division. An important aspect of any status report is the budget follow-up. The very strict financial framework for the LHC project requires constant vigilance, even for the smaller budget volumes.CERN-ST-2000-027oai:cds.cern.ch:4359972000-01-25
spellingShingle Engineering
Pedersen, J
LHC Electrical Installations: Status Report
title LHC Electrical Installations: Status Report
title_full LHC Electrical Installations: Status Report
title_fullStr LHC Electrical Installations: Status Report
title_full_unstemmed LHC Electrical Installations: Status Report
title_short LHC Electrical Installations: Status Report
title_sort lhc electrical installations: status report
topic Engineering
url http://cds.cern.ch/record/435997
work_keys_str_mv AT pedersenj lhcelectricalinstallationsstatusreport