Cargando…

LHC Electrical Installations: Status Report

During 1999 the ST-EL group started detailed preparations for the electrical installations for the LHC. The areas of activity have been zone 18, access point 5 and the preparations around BA 4 and BA 7. Another activity performed during 1999 was the laying of the 18 kV cable link from LHC 6 to LHC 5...

Descripción completa

Detalles Bibliográficos
Autor principal: Pedersen, J
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:http://cds.cern.ch/record/435997

Ejemplares similares