Cargando…
New Working Conditions for the SPS from 2000
After the long shutdown (December 2000 to May 2001), the SPS complex will work with the main water-cooling loop in closed circuit. This will affect the working conditions because of the higher temperature of the supplied water (24 ° C, i.e. 15 K higher) and therefore of the air in the tunnel. The co...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/436011 |
Sumario: | After the long shutdown (December 2000 to May 2001), the SPS complex will work with the main water-cooling loop in closed circuit. This will affect the working conditions because of the higher temperature of the supplied water (24 ° C, i.e. 15 K higher) and therefore of the air in the tunnel. The cooling installations will consequently be upgraded or replaced to meet the new needs, and several new chilled-water stations will be installed to supply the present users. The author will thoroughly explain the main aspects of all these modifications and report the results of the preliminary tests carried out in September 1996. Finally, an overview of the global costs (operational and linked to the project) will be given, taking into account the different consumption of water, electricity and the effects on the magnet components. |
---|