Cargando…
New Working Conditions for the SPS from 2000
After the long shutdown (December 2000 to May 2001), the SPS complex will work with the main water-cooling loop in closed circuit. This will affect the working conditions because of the higher temperature of the supplied water (24 ° C, i.e. 15 K higher) and therefore of the air in the tunnel. The co...
Autor principal: | Nonis, M |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/436011 |
Ejemplares similares
-
Measurements of the SPS transverse impedance in 2000
por: Arduini, Gianluigi, et al.
Publicado: (2001) -
2000 SPS & LEP Machine Statistics
por: Desforges, B, et al.
Publicado: (2000) -
Summary and Conclusions of the SPS DAYS 2000
por: Cornelis, K
Publicado: (2000) -
The SPS running in 1999-2000 and later
por: Faugier, A
Publicado: (1999) -
Limitations on LHC beam intensity in the SPS in 2000
por: Linnecar, Trevor Paul R
Publicado: (2000)