Cargando…
CESAR, 2 MeV electron storage ring; construction period; general view.
A general view of the 2-MeV electron storage-ring model during the last stages of assembly. The injection line for the electrons enters at the bottom of the picture (under the ladder) and meets the ring at the back, to the right. Near there, Joseph Karouanton (S.G.T.E, Paris) (inside the ring), and...
Autor principal: | |
---|---|
Lenguaje: | ENG |
Publicado: |
1962
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/43710 |
Sumario: | A general view of the 2-MeV electron storage-ring model during the last stages of assembly. The injection line for the electrons enters at the bottom of the picture (under the ladder) and meets the ring at the back, to the right. Near there, Joseph Karouanton (S.G.T.E, Paris) (inside the ring), and Marcel Bernasconi (AR Division) are seen testing for leaks in the vacuum system. In white coats are Mervin Barnes (left) and Boony Bruggerman (AR Division), considering the reading shown by one of the vacuum gauges. |
---|