Cargando…

Beam test results of a large forward resistive plate chamber for the CMS/LHC

The first real size resistive plate chamber (RPC) prototype of ME2/1 for the forward region of the Compact Muon Solenoid (CMS) detector was constructed at Korea Detector Laboratory (KODEL). The parallel resistive electrodes of the double gap RPC were made of bakelite whose resistivity was 5*10/sup 9...

Descripción completa

Detalles Bibliográficos
Autores principales: Ahn, S H, Bahk, S Y, Choi, J H, Hong, B H, Hong, S J, Kim, Y J, Kim, J K, Kim, S J, Kim, Y U, Koo, D K, Lee, S J, Lee, K S, Lim, I T, Nam, S K, Pac, M Y, Park, S K, Rhee, J T, Sim, K S, Yang, J T
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:https://dx.doi.org/10.1016/S0168-9002(99)01009-8
http://cds.cern.ch/record/437504
_version_ 1780895480973099008
author Ahn, S H
Bahk, S Y
Choi, J H
Hong, B H
Hong, S J
Kim, Y J
Kim, J K
Kim, S J
Kim, Y U
Koo, D K
Lee, S J
Lee, K S
Lim, I T
Nam, S K
Pac, M Y
Park, S K
Rhee, J T
Sim, K S
Yang, J T
author_facet Ahn, S H
Bahk, S Y
Choi, J H
Hong, B H
Hong, S J
Kim, Y J
Kim, J K
Kim, S J
Kim, Y U
Koo, D K
Lee, S J
Lee, K S
Lim, I T
Nam, S K
Pac, M Y
Park, S K
Rhee, J T
Sim, K S
Yang, J T
author_sort Ahn, S H
collection CERN
description The first real size resistive plate chamber (RPC) prototype of ME2/1 for the forward region of the Compact Muon Solenoid (CMS) detector was constructed at Korea Detector Laboratory (KODEL). The parallel resistive electrodes of the double gap RPC were made of bakelite whose resistivity was 5*10/sup 9/ Omega cm. The prototype was tested at the gamma irradiation facility (GIF) of CERN in an environment of the background intensity ranging up to 1 kHz/cm/sup 2//gap. We report that the full efficiency of 98% has been achieved with time resolution of about 1 ns. These results demonstrate that such a double gap RPC is suitable for the muon trigger in the future experiments. (10 refs).
id cern-437504
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2000
record_format invenio
spelling cern-4375042019-09-30T06:29:59Zdoi:10.1016/S0168-9002(99)01009-8http://cds.cern.ch/record/437504engAhn, S HBahk, S YChoi, J HHong, B HHong, S JKim, Y JKim, J KKim, S JKim, Y UKoo, D KLee, S JLee, K SLim, I TNam, S KPac, M YPark, S KRhee, J TSim, K SYang, J TBeam test results of a large forward resistive plate chamber for the CMS/LHCDetectors and Experimental TechniquesThe first real size resistive plate chamber (RPC) prototype of ME2/1 for the forward region of the Compact Muon Solenoid (CMS) detector was constructed at Korea Detector Laboratory (KODEL). The parallel resistive electrodes of the double gap RPC were made of bakelite whose resistivity was 5*10/sup 9/ Omega cm. The prototype was tested at the gamma irradiation facility (GIF) of CERN in an environment of the background intensity ranging up to 1 kHz/cm/sup 2//gap. We report that the full efficiency of 98% has been achieved with time resolution of about 1 ns. These results demonstrate that such a double gap RPC is suitable for the muon trigger in the future experiments. (10 refs).oai:cds.cern.ch:4375042000
spellingShingle Detectors and Experimental Techniques
Ahn, S H
Bahk, S Y
Choi, J H
Hong, B H
Hong, S J
Kim, Y J
Kim, J K
Kim, S J
Kim, Y U
Koo, D K
Lee, S J
Lee, K S
Lim, I T
Nam, S K
Pac, M Y
Park, S K
Rhee, J T
Sim, K S
Yang, J T
Beam test results of a large forward resistive plate chamber for the CMS/LHC
title Beam test results of a large forward resistive plate chamber for the CMS/LHC
title_full Beam test results of a large forward resistive plate chamber for the CMS/LHC
title_fullStr Beam test results of a large forward resistive plate chamber for the CMS/LHC
title_full_unstemmed Beam test results of a large forward resistive plate chamber for the CMS/LHC
title_short Beam test results of a large forward resistive plate chamber for the CMS/LHC
title_sort beam test results of a large forward resistive plate chamber for the cms/lhc
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1016/S0168-9002(99)01009-8
http://cds.cern.ch/record/437504
work_keys_str_mv AT ahnsh beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT bahksy beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT choijh beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT hongbh beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT hongsj beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT kimyj beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT kimjk beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT kimsj beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT kimyu beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT koodk beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT leesj beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT leeks beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT limit beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT namsk beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT pacmy beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT parksk beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT rheejt beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT simks beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc
AT yangjt beamtestresultsofalargeforwardresistiveplatechamberforthecmslhc