Cargando…
View of the LEP tunnel from the UJ17 cavern at Point 1.
Autor principal: | Maximilien Brice |
---|---|
Lenguaje: | ENG |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/43799 |
Ejemplares similares
-
The digging of UX-15, the cavern that will house ATLAS, reached the upper ceiling of LEP on October 10th.
Publicado: (2001) -
Cavern
Publicado: (2002) -
The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
Publicado: (2001) -
Installation of the ventilation sheaths at UJ24.
por: Serge Dailler
Publicado: (1987) -
The Big Dig : the excavation of the LEP tunnel was the most formidable civil-engineering venture in the history of CERN and Europe's largest civil-engineering project prior to the Channel Tunnel.
Publicado: (2004)