Cargando…

Experimental Results and Technical Results and Development at CTFII

The second phase of the Compact Linear Collider Test Facility (CTF II) has demonstrated the feasibility of two key ingredients of the Compact Linear Collider scheme (CLIC) [1], namely the acceleration with a 30 GHz normal conducting linac and the 30 GHz RF power production by a tightly-bunched, high...

Descripción completa

Detalles Bibliográficos
Autor principal: Braun, Hans Heinrich
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:http://cds.cern.ch/record/447076
_version_ 1780896001817575424
author Braun, Hans Heinrich
author_facet Braun, Hans Heinrich
author_sort Braun, Hans Heinrich
collection CERN
description The second phase of the Compact Linear Collider Test Facility (CTF II) has demonstrated the feasibility of two key ingredients of the Compact Linear Collider scheme (CLIC) [1], namely the acceleration with a 30 GHz normal conducting linac and the 30 GHz RF power production by a tightly-bunched, high-charge drive beam running parallel to the main beam. This beam is produced and accelerated with a 3 GHz linac using an RF-photo-injector and two travelling-wave sections, all specially developed for handling very high charges. A magnetic chicane compresses the micro-bunches to their nominal length. A mm-wave spectrometer, coupled to the beam pipe, allows non-destructive measurements of bunch length. So far a total acceleration of 60 MeV has been obtained using a string of five accelerating structures with a total active length of 1.4 m. The corresponding drive-beam deceleration is 6 MeV. The flexibility and extensive beam instrumentation allows a variety of other experiments, such as measurements of emittance growth and energy loss in bunch compressors due to coherent synchrotron radiation, high-gradient tests in single-cell 30 GHz cavities, high-power tests of a planar 30 GHz RF structure and tests of beam position monitor prototypes.
id cern-447076
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2000
record_format invenio
spelling cern-4470762021-11-11T09:55:34Zhttp://cds.cern.ch/record/447076engBraun, Hans HeinrichExperimental Results and Technical Results and Development at CTFIIAccelerators and Storage RingsThe second phase of the Compact Linear Collider Test Facility (CTF II) has demonstrated the feasibility of two key ingredients of the Compact Linear Collider scheme (CLIC) [1], namely the acceleration with a 30 GHz normal conducting linac and the 30 GHz RF power production by a tightly-bunched, high-charge drive beam running parallel to the main beam. This beam is produced and accelerated with a 3 GHz linac using an RF-photo-injector and two travelling-wave sections, all specially developed for handling very high charges. A magnetic chicane compresses the micro-bunches to their nominal length. A mm-wave spectrometer, coupled to the beam pipe, allows non-destructive measurements of bunch length. So far a total acceleration of 60 MeV has been obtained using a string of five accelerating structures with a total active length of 1.4 m. The corresponding drive-beam deceleration is 6 MeV. The flexibility and extensive beam instrumentation allows a variety of other experiments, such as measurements of emittance growth and energy loss in bunch compressors due to coherent synchrotron radiation, high-gradient tests in single-cell 30 GHz cavities, high-power tests of a planar 30 GHz RF structure and tests of beam position monitor prototypes.CERN-PS-2000-030-AEoai:cds.cern.ch:4470762000-07-10
spellingShingle Accelerators and Storage Rings
Braun, Hans Heinrich
Experimental Results and Technical Results and Development at CTFII
title Experimental Results and Technical Results and Development at CTFII
title_full Experimental Results and Technical Results and Development at CTFII
title_fullStr Experimental Results and Technical Results and Development at CTFII
title_full_unstemmed Experimental Results and Technical Results and Development at CTFII
title_short Experimental Results and Technical Results and Development at CTFII
title_sort experimental results and technical results and development at ctfii
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/447076
work_keys_str_mv AT braunhansheinrich experimentalresultsandtechnicalresultsanddevelopmentatctfii