Cargando…
Design Studies for a High Current Bunching System for CLIC Test Facility (CTF3) Drive Beam
A bunching system is proposed for the initial stage of CTF3 which consists of one (two) 3 GHz prebunchers and one 3 GHz travelling wave (TW) buncher with variable phase velocities. The electron beam is emitted from a 140 KV DC gun. Since the macropulse beam current (3.5 A) at the exit of the TW bunc...
Autores principales: | Thiery, Y., Gao, J., Le Duff, J. |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/447450 |
Ejemplares similares
-
Measurement of the short bunch length in the CLIC test facility (CTF)
por: Battisti, S
Publicado: (1993) -
Bunch Frequency Multiplication in the CLIC Test Facility CTF3
por: Tecker, F A, et al.
Publicado: (2003) -
Measurement of the short bunch length in the CLIC test facility (CTF)
por: Battisti, S
Publicado: (1993) -
Review of the Drive Beam Stabilization in the CLIC Test Facility CTF3
por: Dubrovskiy, A, et al.
Publicado: (2013) -
Beam Tests at the CLIC Test Facility, CTF3
por: Corsini, Roberto, et al.
Publicado: (2014)