Cargando…
A Novel Eddy Current Septum Magnet for SPS Extraction towards LHC and CNGS
A new East Fast-Extraction System is under construction in the SPS, to supply particles with a maximum batch length of 7.8 us and 10.5 us to the LHC and to CNGS (CERN Neutrino to Gran Sasso), respectively. The extraction septum magnets actually used at the SPS have been designed for slow extraction...
Autores principales: | Schröder, G H, Weisser, W, Carlier, E, Dieperink, J H, Ducimetière, L, Goddard, B, Lázár, C, Mayer, M, Vossenberg, Eugène B, Weterings, W |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/447554 |
Ejemplares similares
-
The New SPS Extraction Channel for LHC and CNGS
por: Goddard, B, et al.
Publicado: (2000) -
Development of an Eddy Current Septum for LINAC4
por: Barnes, M, et al.
Publicado: (2008) -
Design aspects related to the reliability of the LHC beam dump kicker systems
por: Dieperink, J H, et al.
Publicado: (1997) -
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
por: Gaxiola, E, et al.
Publicado: (2004) -
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
por: Humberto Gaxiola, Enrique, et al.
Publicado: (2004)