Cargando…
Experience with the Multi-Year Implementation of an Industrial Control System
In 1990, CERN passed a multi-year purchasing and installation contract for the LEP 200 Cryogenics control system with ABB, one of the world's leading suppliers of integrated Distributed Control Systems (DCS). A financial framework provided over a period of eight years the required supplies. The...
Autores principales: | Kuhn, H K, Gayet, P, Juillerat, A C, Rabany, Michel, Wollès, J C |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/453864 |
Ejemplares similares
-
Specification, installation and commissioning of a large industrial control system for the LEP200 cryogenics
por: Kuhn, H K, et al.
Publicado: (1993) -
Interfacing industrial process control systems to LEP/LHC
por: Rabany, Michel
Publicado: (1992) -
Innovative aspects of the controls for the helium cryoplants in the CERN SPS accelerator
por: Delruelle, N, et al.
Publicado: (1994) -
Industrial control solutions in research laboratories
por: Rabany, Michel
Publicado: (1995) -
The beam synchronous timing system for the LEP instrumentation
por: Baribaud, Guy, et al.
Publicado: (1990)