Cargando…
The octupoles take pole position
The first preseries octupole magnet was delivered to CERN in December 2001. Hooked up to a main quadrupole magnet, its function will be to correct imperfections in the beams. The LHC will be fitted with about 5000 corrector magnets, whose task it will be to provide maximum precision in beam collisio...
Lenguaje: | eng fre |
---|---|
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/45521 |
Ejemplares similares
-
Endocytosis puts exocytosis in pole position
por: Leslie, Mitch
Publicado: (2013) -
Linking pore and pole
por: Tuma, Rabiya S.
Publicado: (2005) -
ATLAS's superconducting solenoid takes up position
Publicado: (2004) -
Building a bridge to a new spindle pole body
por: Short, Ben
Publicado: (2015) -
... The sign of the LHC octupoles
por: Fartoukh, Stephane
Publicado: (2012)